New Premises for Good Health Products



Harbour's work for this project was for the foundations and blockwork to the main warehouse area to allow the steel portal frame to be built and clad, followed by a post tensioned floor. At the same time the office and pharmaceutical area needed to be constructed over two levels comprising foundations, precast retaining panels and extensive stitch joints and water barriers, followed by highly polished concrete floor slabs to meet the strict criteria for the building's intended purpose. The external carpentry package was then completed along with high quality concrete feature stair treads to the main stair. Externally, Harbour also carried out major capping beams to complete the isolation of rain gardens.