Papatoetoe and Penrose Rail Over Bridges

 

The work undertaken was to form precast elements of the bridge structures due to the logistics of working in the rail corridor. This also applied to the toppings required to the ductal precast bridge spans. The components then had to be assembled outside normal working hours while the trains were not in operation.